Central Utilities Block – PDH

by dev

canada

CENTRAL UTILITIES BLOCK

COMPLETED IN 2020

CAPACITY

60 MMSCFD Phase 1

SCOPE OF SUPPLY

  • Condensate Receiver System
  • Hot Glycol System
  • Cold Glycol System
  • Fuel Gas Conditioning System
  • Deethanizer Off Gas Compression
  • Aqueous Ammonia Storage and Injection
  • Miscellaneous Pressure Vessels

SERVICES

Engineering & Design

Fabrication

Procurement

Installation

Commissioning & Testing

Site Construction

SCOPE OF SUPPLY

  • Reception & Export
  • Inlet Heating & Separation
  • Amine Gas Sweetening
  • Hydrocarbon Dewpoint
  • De-ethanizer & De-ethanizer
  • Overhead Compressor
  • Propane Refrigeration EG
  • Regeneration
  • NGL Storage & LACT
  • Sales Gas Metering
  • Acid Gas Incinerator
  • Auxiliaries (Process & Utility Heat Medium, Instrument Air, Fuel Gas, Flare Drain, Sour Water)
  • Control Systems, MCC & Emergency
  • Power Generation

SERVICES

  • Detailed Engineering & Design
  • Procurement
  • Fabrication
  • Construction
  • Commissioning