Liwan 3-1 South China Sea, Deepwater Gas Development

client-globe
Location:

Offshore Platform on South China Sea

The project included the full engineering design of the topsides and fabrication of modular equipment that could be shipped and assembled with minimum labour. TDE conducted shop testing of all equipment prior to shipping. Engineering was approved by the client and certified by Bureau Veritas in Houston, Texas. TDE shipped the project from TDE’s yard to the client in China.

Equipment

Features

Two dehydration systems

215 MMSCFD of natural gas with TEG regeneration system for 3,300 USG/h and glycol storage package